|
Railroad with Black Mountain in background (forested area) 116 KB, approx. 23 seconds at 56.6Kbps |
|
West flank of Black Mountain looking north 155 KB, approx. 30 seconds at 56.6Kbps |
|
Looking north - Devonian Guilmette Formation limestone along axis of anticline 193 KB, approx. 37 seconds at 56.6Kbps |
|
Juniper Adit -- Up to 17.8% zinc returned from rock samples 205 KB, approx. 39 seconds at 56.6Kbps |
|
Juniper Adit -- Quartz stockwork 277 KB, approx. 53 seconds at 56.6Kbps |
|
Medicine Creek -- Sample returned 9.8% zinc, 0.38% lead 264 KB, approx. 50 seconds at 56.6Kbps |
|
Saddle Workings -- Sample returned 34.3% zinc, 0.77% lead 361 KB, approx. 1 minute, 8 seconds at 56.6Kbps |
|
Broken Pick Adit -- Samples returned up to 10.4% zinc 271 KB, approx. 52 seconds at 56.6Kbps |
|
Quetzal Project Drill Core 241 KB, approx. 46 seconds at 56.6Kbps |
|
Quetzal Drill Core - > 30% zinc 110 KB, approx. 21 seconds at 56.6Kbps |
|
Vuggy, brecciated Permian carbonate rock 310 KB, approx. 59 seconds at 56.6Kbps |
|
High-grade non-sulphide zinc boulders 521 KB, approx. 1 minute, 38 seconds at 56.6Kbps |
|
Lodestar Zone Trench - 22.3% to 32% zinc over 15 metres 68 KB, approx. 14 seconds at 56.6Kbps |
|
Antelope Project Landscape 154 KB, approx. 30 seconds at 56.6Kbps |
|
Historic tunnel on Lodestar Zone 284 KB, approx. 54 seconds at 56.6Kbps |
|
High grade zinc - Lodestar Zone 296 KB, approx. 56 seconds at 56.6Kbps |
|
Zinc zap reaction - Lodestar Zone 110 KB, approx. 21 seconds at 56.6Kbps |
|
Drilling 198 KB, approx. 38 seconds at 56.6Kbps |
|
C. Schulze preparing drill core 218 KB, approx. 42 seconds at 56.6Kbps |
|
Examining drill core 203 KB, approx. 39 seconds at 56.6Kbps |
|
Splitting drill core with saw 94 KB, approx. 19 seconds at 56.6Kbps |
|
View of Amadeus Zone and Drill Pads 145 KB, approx. 28 seconds at 56.6Kbps |
|
View of Minto Copper-Gold Mine - 40 km from Sonora Project 43 KB, approx. 9 seconds at 56.6Kbps |
|
Native gold in Drill Hole SG-06-06 128 KB, approx. 25 seconds at 56.6Kbps |
|
The unidentified sulphosalt in Drill Hole SG-06-06 has been identified as bismuthinite. 171 KB, approx. 33 seconds at 56.6Kbps |
|
Gold in Drill Core from Hole SG-06-06 103 KB, approx. 20 seconds at 56.6Kbps |
|
Gold in Drill Core from Hole SG-06-06 104 KB, approx. 20 seconds at 56.6Kbps |
|
Setting up the Drill 89 KB, approx. 18 seconds at 56.6Kbps |
|
Base Camp 69 KB, approx. 14 seconds at 56.6Kbps |
|
Drill Site at Amadeus Zone 196 KB, approx. 37 seconds at 56.6Kbps |
|
View of Minto Copper Project (40 km from Sonora) 289 KB, approx. 55 seconds at 56.6Kbps |
|
Gossans on Hayes Creek 309 KB, approx. 59 seconds at 56.6Kbps |
|
Previous trenches on Sonora property 318 KB, approx. 1 minute at 56.6Kbps |
|
C. Schulze examining rock exposure 330 KB, approx. 1 minute, 2 seconds at 56.6Kbps |
|
Consulting Geologist J. Cleary in Cinco Hermanos workings 57 KB, approx. 12 seconds at 56.6Kbps |
|
Massive galena and bright red zinc zap reaction in Cinco Hermanos workings 82 KB, approx. 16 seconds at 56.6Kbps |
|
Massive galena in Cinco Hermanos workings 93 KB, approx. 18 seconds at 56.6Kbps |
|
Mineralized breccia and zinc zap reaction (before and after) 277 KB, approx. 53 seconds at 56.6Kbps |
|
Firestone QP John Cleary examining drill core on the TH-06-3 drill site 53 KB, approx. 11 seconds at 56.6Kbps |
|
Al Workman of WGM, Lori Walton and Ken Shortt examine drill core 66 KB, approx. 13 seconds at 56.6Kbps |
|
Hematite in Sandstone 180 KB, approx. 35 seconds at 56.6Kbps |
|
Kimball Zone Boulder 111 KB, approx. 22 seconds at 56.6Kbps |
|
Taking Sample 128 KB, approx. 25 seconds at 56.6Kbps |
|
Thrust Fault 197 KB, approx. 38 seconds at 56.6Kbps |
|
Waterton River 90 KB, approx. 18 seconds at 56.6Kbps |
|
Rock Sampling 177 KB, approx. 34 seconds at 56.6Kbps |
|
More Sampling 155 KB, approx. 30 seconds at 56.6Kbps |
|
Smithsonite (zinc carbonate) 61 KB, approx. 12 seconds at 56.6Kbps |
|
Tunnels 187 KB, approx. 36 seconds at 56.6Kbps |
|
Drill Plan for Louise Lake, Spring 2005 View Map in PDF Format 138 KB, approx. 27 seconds at 56.6Kbps |
|
Torlon Hill 78 KB, approx. 15 seconds at 56.6Kbps |
|
View of Torlon Hill valley 71 KB, approx. 14 seconds at 56.6Kbps |
|
L. Walton, President for Firestone (on right) with Property Owner representative (on left) 76 KB, approx. 15 seconds at 56.6Kbps |
|
Drill Plan for Louise Lake, Summer 2004 46 KB, approx. 10 seconds at 56.6Kbps |
|
Splitting Core 25 KB, approx. 6 seconds at 56.6Kbps |
|
Diamond Drill Core 70 KB, approx. 14 seconds at 56.6Kbps |
|
Diamond Drill 164 KB, approx. 32 seconds at 56.6Kbps |
|
Diamond Drill 98 KB, approx. 19 seconds at 56.6Kbps |
|
Sonora Gulch - Photo 1 55 KB, approx. 11 seconds at 56.6Kbps |
|
Bradshaw Hill - Photo 3 53 KB, approx. 11 seconds at 56.6Kbps |
|
Bradshaw Hill - Photo 2 81 KB, approx. 16 seconds at 56.6Kbps |
|
Bradshaw Hill - Photo 1 54 KB, approx. 11 seconds at 56.6Kbps |
|
Drill Pad Preparation 340 KB, approx. 1 minute, 4 seconds at 56.6Kbps |
|
Drill Pad Construction 338 KB, approx. 1 minute, 4 seconds at 56.6Kbps |
|
|