Firestone Ventures Inc.



Show printable version of 'Firestone Ventures Resumes Drilling at Torlon Hill...' in a New Window



 Mon Jan 22, 2007
Firestone Ventures Resumes Drilling at Torlon Hill Zinc Project, Expands Drill Program

 January 22, 2006 -- Firestone Ventures Inc. (FV:TSX-V, F5V:FSE) is pleased to announce the resumption of drilling at the Company's Torlon Hill zinc project. The winter 2006/2007 drill program has expanded and will now include up to 50 drill holes comprising 3,600 metres. To date, a total of 935 metres in 21 holes has been completed.

Results back from the first 13 of the 21 holes drilled before the holiday break include 13.7 metres of 26.6% zinc (Hole TH06-23), 8.9 metres of 21.6% zinc (Hole TH06-25) and 15.8 metres of 19.5% zinc (Hole TH06-28). The results to date from the current drill campaign (see January 11, 2007 news release) indicate that the high-grade zinc mineralization extends approximately 100 metres northwest of the previously drilled area. Most of the mineralization defined by drilling is exposed on surface or near-surface. The drill program and phasing of holes is subject to change as additional information is obtained and interpreted by the Company's geological team during the course of the program, which is expected to finish in mid to late March, 2007.

"We are very pleased with the rapid advancement of the drill project." says Lori Walton, President of Firestone Ventures. "We look forward to additional in-fill drilling and expanding to the south and to the west."

The road-accessible Torlon Hill project is located 18 road kilometres northwest of the city of Huehuetenango, near the Pan-American Highway in western Guatemala. A drill hole location map, previous news releases, a longitudinal section sketch, FAQ sheet, technical report and photos are available at www.firestoneventures.com.

This news release has been reviewed and approved by John Cleary (CPC), Qualified Person for the Torlon Hill project in accordance with regulations under National Instrument 43-101.

Firestone Ventures Inc. is exhibiting at the Cambridge House Resource Investment Conference in Vancouver, January 21 and 22 (Booth 903) and will have maps, new drill core samples and information on the Torlon zinc project.

Firestone Ventures Inc. is a well-financed Canadian-based resource exploration and development company with zinc, gold and uranium projects in Western Canada and Central America. The common shares of the Company are currently listed on the TSX Venture Exchange (symbol FV) and the Frankfurt Stock Exchange (symbol F5V). For further information please contact:

Lori Walton, P. Geol., President
Toll Free: 1-888-221-5588
Fax: (780) 428-3476
info@firestoneventures.com
www.firestoneventures.com
Trading Symbol: FV: TSX-V; F5V: FSE

For Investor Relations please call: Contact Financial Inc. at (604) 689-7422

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release
 
 

You can view the Next News Releases item: Tue Feb 13, 2007, Firestone Ventures Reports Torlon Hill Drill Results, including 2.7 metres of 45.4% Zinc

You can view the Previous News Releases item: Mon Jan 15, 2007, Firestone Ventures Reports High-Grade Intercept of 6.21 g/t Gold Across 15.3 Metres, Open at Depth, from Sonora Project, Yukon Territory

You can return to the main News Releases page, or press the Back button on your browser.